Projects

North Stockton Railroad Grade Separation

North Stockton Railroad Grade Separation

Safework provided track inspection during the construction for the North Stockton Railroad Grade Separation project. This project involved grade separations and bridge replacements to improve the level of service for motorists by eliminating at grade railroad crossings and improve safety along each of the roadway segments. Construction value $55M

LACCD Sustainable Building Program

LACCD Sustainable Building Program

Safework is providing Safety Management services in support of the $6B bond program to renovate, modernize and improve all nine colleges within the Los Angeles Community College District. Construction projects include new academic buildings, student services centers, child development centers and sports facilities as well as more efficient central plants technology upgrades and renewable energy projects.

Los Angeles International Airport Modernization Taxi Lanes

Los Angeles International Airport Modernization Taxi Lanes

Safework provided Safety Management Oversight and Project Engineering services for Los Angeles World Airport (LAWA) during the relocation of Taxilane “S” and construction of the new Bradley West Terminal. Construction value $150M

Foresthill Road Bridge Seismic Retrofit

Foresthill Road Bridge Seismic Retrofit

Safework is providing safety management services during the retrofit of the Auburn–Foresthill Bridge built in 1973. As part of the Local Agency Seismic Retrofit Program, Placer County is overseeing the project that includes: retrofitting of the existing bridge with removal and replacement of existing structural steel elements; painting; placement of new concrete bridge decking; raising the height of the pedestrian railing; construction of a new catwalk system for bridge maintenance and replacement of the existing bridge deck joint seals and assemblies. Construction value $74M.

Oakland Touchdown Bay Bridge

Oakland Touchdown Bay Bridge

Safework is providing safety management services during construction of the Oakland Touchdown segment for the new East Span of the San Francisco-Oakland Bay Bridge. This section of the bridge will connect the new Bay Bridge Skyway to Interstate 80. Safework staff conducted Owner Controlled Insurance Program (OCIP) safety auditing, safety training and Worker’s Compensation management.

South Bay Expressway

South Bay Expressway

Safework provided safety management services, safety training and labor compliance services during the construction of the $635M South Bay Expressway on State Route 125, California’s first road built as a public/private partnership. The toll road was funded by the private company California Transportation Ventures, Inc. and the United States Department of Transportation, Caltrans, San Diego Association of Governments (SANDAG), and the City of Chula Vista.

Los Angeles Federal Courthouse & Roybal Federal Building

Los Angeles Federal Courthouse & Roybal Federal Building

Safework provided inspection services on the energy conservation and HVAC upgrade system installed in the US Federal Courthouse and Roybal Federal Building in Los Angeles.

Pier G Modernization

Pier G Modernization

Safework is providing track inspection and quality assurance during construction of the Port’s $52M intermodal rail yard including signalization, grading and utilities. Construction includes approximately 2 miles of side-by-side yard trackage, signalization, water lines, storm drains and grading.